(영문) 청주지방법원 2013.10.18 2013고단718

건축법위반등

Text

Defendant

A shall be punished by a fine of KRW 7,00,00,00,00,00 for six months of imprisonment for the defendant’s educational foundation B.

However, the defendant A.

Reasons

Punishment of the crime

Defendant

B School juristic persons are those who conduct construction and manufacturing business for the operation of schools while establishing and managing the E University, and Defendant A is the head of the control facility team belonging to the E University under the said Foundation who takes charge of the management and authorization of the school and its affiliated facilities.

1. Defendant A

(a) Any person who intends to construct a building in violation of the Building Act shall obtain permission from the competent authorities, and any person who intends to construct a building, such as a retaining wall, for the creation of a site, shall report it to the competent authorities;

Nevertheless, from November 201 to December 201 of the same year, the Defendant constructed 5,911 square meters in total on the land of 5,911 square meters located outside the urban area located in the Donsan-gun, Donsan-gun, and constructed 79.98 square meters in total, 5 buildings of reinforced concrete 1st, and installed 80.2 square meters in total without reporting to the Donsan-gun.

(b) Any person who intends to construct buildings, install structures, or change the form and quality of land in violation of the National Land Planning and Utilization Act shall obtain permission from the competent authority;

Nevertheless, the Defendant committed an act in the above paragraph (a) without obtaining permission from the head of Magsan Gun at the same time and place, and changed the form and quality of land in the aggregate of 6 square meters in the above G, 7 square meters in H, 148 square meters in I, 96 square meters in J, and 6,168 square meters in J.

(c) Where the same business operator intends to additionally implement a development project in a planned control area adjacent to an area for which permission has already been granted, the total area for which permission has already been granted and the area for which additional permission has already been granted shall be at least 10,000 square meters, and where the area for which additional permission has been granted is at least 3,000 square meters, the construction for the relevant

On May 25, 201, the Defendant had already obtained a building permit on the same F land adjacent to K, L, M, and N land in Chungcheongnam-do.