beta
(영문) 인천지방법원 2017.06.08 2016고단1085

업무상과실치상등

Text

Defendant

A and B Imprisonment for 10 months, Defendant C for 8 months without prison labor, and Defendant D for 5,00,000 won.

Reasons

Punishment of the crime

"2016 Highest 1085"

1. Defendant A, B, and C’s occupational injury, occupational injury, and interference with the traffic of the vehicle in practical skill;

A. Defendant A, including a summary of the instant construction site, the Defendants’ duties, and the conclusion of a contract for the installation of cretains, is the owner of a new construction project by directly obtaining a construction license for the construction of the complex from the representative director of the construction company (NN) on August 10, 2015 to July 31, 2016 for the construction period, with the scale of 10 stories below the ground and 10 stories above the 341 square meters of steel site, such as Bupyeong-gu, Incheon, Bupyeong-gu, J, K, and L, as well as the 1980 million won of construction cost, and the construction work directly for the construction of the complex after obtaining a construction license for the construction of the complex from the representative director of the construction company (NNN) on August 10, 2015 to the 31, 2016.

Defendant

C With Defendant A’s father, the construction of steel and concrete typ, etc. at the construction site of the said complex building

Around July 2015, P and Defendant A's request to manage and supervise the above construction site as a whole, such as the distribution of steel bars and the installation of concrete, and the management and supervision of the construction site as a whole, and the role of Defendant A's agent and the substantial site manager.

Defendant

B Upon receipt of an order to install other workshops from the above company in the course of performing duties, such as leasing and installing string equipment, B is a representative of corporation D, and a person who is in charge of confirmation of the site conditions, such as the ground for the installation of strings, and review in advance the design or construction methods of the strings, and determine the method of stable establishment, construction after consultation with the contractor, and construction by Q, etc., who is in charge of the installation of strings and supervision after consultation with the contractor.

Defendant

C is fixed to carry out the construction work at the construction site of the complex building around August 2015.