beta
(영문) 창원지방법원 진주지원 2015.05.27 2014고단947

배임수재

Text

The Defendants are not guilty. The summary of the judgment of innocence against the Defendants is published.

Reasons

1. Summary of the facts charged

A. Defendant A (hereinafter “instant company”) performed duties as the director of production technology team from June 1, 2007 to January 2009, and as the vice director of production technology team from January 1, 2009 to April 2014, Defendant A (hereinafter “instant company”) performed overall control over the preparation of the work drawings at the shipbuilding site, such as LUG drawings and sag drawings.

On January 28, 2010, the Defendant received a request from the instant company’s office located in Sacheon-si for the evaluation of the performance of the above open studs so that it can supply the above open stamps produced in G from G to the instant company at its own office of Sacheon-si, and the Defendant prepared a plan reflecting the drawing to use a specific product at the site work site, he may request the purchase team to place an order for the material related thereto, and the purchase team shall accordingly issue an order for the material. Around January 28, 2010, the Defendant prepared the on-site work drawing by reflecting the open straws produced by G without any internal decision-making process.

After that, around May 15, 2010, the Defendant requested the purchase team to place an open satisfaction order for the production of G in accordance with the above on-site work drawing. Upon the above request of the purchase team, the purchase team ordered to place an order for satisfaction straws open in G around June 3, 2010, and B supplied the company of this case with open straws for two vessels on July 8, 2010.

On November 8, 2011, the Defendant, while applying for design registration of B with respect to the above open garment fee, knew that exclusive trade was inevitable and unit price increase, requested a re-purchase team to place an open garment fee for production with respect to five vessels newly built at its office. On December 17, 2011, the Defendant, at the purchase team, ordered five vessel straws from the purchase team to G.

The Defendant from B around December 20, 201, which took place the above internal goods.