beta
(영문) 부산지방법원 2016.02.03 2014가합5381

손해배상(기)

Text

1. Defendant B, C, D, E, and F

(a) disclose or disclose to a third party the technical information listed in Appendix 1 List;

Reasons

1. Basic facts

A. The Plaintiff’s representative director is the Plaintiff’s principal business to establish K for the purpose of manufacturing automation machinery, etc. at 0.1.2.2.2, 2001 after the Plaintiff’s establishment of K for the purpose of manufacturing automation machinery, etc. at 0.3 p.m. from 190 to 2.3 p.m., the Plaintiff’s construction of industrial machinery and manufacturing automation machinery at 1.m. at the same time. From 192 to 2005, the Plaintiff was engaged in manufacturing and manufacturing machinery at the same time by using 5.0 p.m. machinery and equipment, which had been manufactured at the same time, for the first time, from 0.m., to 3m.m., the Plaintiff’s construction of 1 p.m. machinery and equipment, which had been in charge of manufacturing and automation of vehicles at the same time, to 10.m., to 3m. manufacturing and recycling of vehicles at the same time, and at the same time, to 10.205 p.m.