(영문) 창원지방법원거창지원 2017.11.09 2017가합27

물품대금

Text

1. The Defendant (Counterclaim Plaintiff) shall pay to the Plaintiff (Counterclaim Defendant) KRW 787,740,140, and the amount of said KRW 140 from February 22, 2017.

Reasons

A principal lawsuit and a counterclaim shall be deemed simultaneously.

Basic Facts

Electric buses on the ground of the exchange (hereinafter referred to as "BS EV") are operated by laying and operating a large capacity exhauster capable of replacing to the hold of existing low-end buses. It means electric buses that are automatically replaced to a buffer exhauster through a robot system installed in the exhaustter exchange system installed in the exhaustter exchange system. The Plaintiff had both Quic Pk-up, and BTM (a device fixed in BSV), BTM (Bus Telecom unit, action and proceeding status of the ship exchange) and equipment related to the distribution exchange, distribution exchange, and distribution system.

On January 8, 2015, the Energy Management Corporation (hereinafter “Korea Energy Corporation”) changed its mission to “Korea Energy Corporation” in July 2016, and publicly announced that it will receive project expenses of KRW 26.4 billion (hereinafter “the instant Support Project”) for the Seoul Special Self-Governing Province’s Electric Motor Vehicle Lease Support Project (hereinafter “the instant Support Project”) and select a business operator operating a b.6 billion (the State expenses of KRW 1.3.2 billion, local expenses of KRW 1.3.2 billion), and the electrical bus supply targets in Jeju Special Self-Governing Province pursuant to the aforementioned public announcement were 49 vehicles in 2015, 3 vehicles in 2016, 37 units in 2017, 119 units in total, and 119 units in 2017.

On March 27, 2015, the Korea Energy Corporation and the Ministry of Trade, Industry and Energy have selected the Plaintiff as a priority negotiation subject to the instant support project, and thereafter, the Plaintiff and future nanotechnology Co., Ltd.

Non-tension Jeju Co., Ltd., a special purpose corporation established by the corporation, is referred to as "non-tension Jeju," and when referred to as "non-tension Jeju" with the plaintiff, the plaintiff is the plaintiff.

, around June 16, 2015, between the Korea Energy Management Corporation and the Korea Energy Management Corporation. < Amended by Presidential Decree No. 26357, Jun. 16, 2015>