(영문) 청주지방법원충주지원 2015.11.12 2014가합550

손해배상

Text

1. Defendant Geum River Construction Co., Ltd.: (a) KRW 28,511,302 for the Plaintiff and its related thereto, from January 14, 2015 to November 12, 2015.

Reasons

In light of the purport of the entire pleadings as a result of the appraisal of defects by a partial appraiser D, which can be found as defects 185,000, 3737,000 (2) of the defects, the following items are deemed to constitute defects for the same reasons as the stated in the pertinent “reasons for determination,” and the expenses incurred in repairing them may be acknowledged as having been stated in the relevant column of “cost for repair of defects.”

1.-B of the reasons for the determination of the cost of repairing defects.

-Drhythrhy construction of 1,245,802 construction of the front rock of the building with the floor of the first floor being constructed with the trhythrhhy of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the rhyth of the building, but at the present, the 1.-b. the remainder of the cost of installing the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of the ryth of

-⑼ 건물 옆면 강화유리 미설치 2,879,000 현재 창틀은 설치되어 있으나 강화유리는 설치되지 아니하였는바, 설계도면과 계약서에 1층 우측 부출입구 창호시공에 관한 표시가 없지만 원고 주장과 같이 준공 후 창호를 시공하기로 약정하였던 것으로 판단됨 1.-다.

- (i) At the end of 814,000 of the instant building where the entire parking lot was low, the double of the instant building is less than that of the surrounding site, unlike the construction drawings, and the rainwater flown out. Such a defect is sufficient to repair the building on the parking lot floor so that rainwater can be drained into the top.

As such, the cost of installing the floor sirens of the parking lot calculated by the appraiser shall be recognized as the cost of remuneration.

- mean 84,000 pentle floor floor on the wall of the building consisting of 84,000 square meters.