(영문) 서울중앙지방법원 2016.11.30 2016가단5001864

구상금

Text

1. The Defendant’s KRW 710,355,925 as well as the Plaintiff’s annual rate from May 23, 2013 to November 30, 2016, and the following.

Reasons

1. Facts of recognition;

A. On June 27, 2011, the Plaintiff concluded an insurance contract (hereinafter referred to as the “instant insurance contract”) with Gold LLC Co., Ltd. (hereinafter referred to as “gold Do”), and with a factory located in 1243 square meters in Gwangju Mine-dong (hereinafter referred to as “instant factory”), machinery and office fixtures, etc., with the purchase price of KRW 190,00,000, and with the insurance period from June 27, 201 to June 27, 2016, as carbonless dividends Samsung Property Insurance (hereinafter referred to as “instant insurance contract”).

B. From October 1, 2012, the Defendant leased all of the instant factories and equipment to the end of 170,000,000 won as lease deposit, and the period of September 30, 2014. The Defendant was manufacturing white electric appliances products at the instant plant.

C. On February 22, 2013, a fire occurred at around 23:27, within the instant factory (hereinafter “instant fire”).

A factory building due to the instant fire was destroyed to require KRW 348,154,178, such as re-construction costs and repair costs, and the amount equivalent to KRW 1,159,279,062 for machines in the factory and KRW 28,379,830 for home appliances were destroyed.

The appraiser of the National Institute of Scientific Investigation who investigated the fire of this case is likely to have been launched from the screen folder installed in the color container of the factory, in view of the fire condition of the building of this case and the location where the scams of the scams of the scams of the building of this case are distinguished. The cause of the scams can be generated by electrical heat generated in the process where the scams of the scams of the scams of the scams of the scams of the scams of the scams of the scams of the scams of the scams of the scams of the plant

E. On May 22, 2013, the Plaintiff paid a total of KRW 1,420,711,850 as insurance money within the scope of the said amount of damages.

[Ground of recognition] A.