(영문) 서울중앙지방법원 2018.07.20 2016가합536935

손해배상(기)

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff, including the part resulting from the supplementary participation.

Reasons

(b) be liable to pay any damages for delay.

Judgment

Facts of recognition

On December 13, 2010, the Intervenor sent to the Defendant an official door stating that “The Daejeon Preventive Day may cause a change of water control according to temperature due to its characteristics as commercial floor material. In particular, in order to minimize such new construction changes, water control changes may occur more in the construction of the same season, the Intervenor sent to the Defendant an official door stating that “In order to minimize such new construction changes, it shall be particularly cautioned prior to construction/construction and after maintenance/construction, as follows:

The above official text included the following “matters to be considered in executing construction”.

A. Before the execution - In the case of the execution of a winterer, the main time shall be 48 hours at least that the material is concealed at the internal temperature (e.g., the level of video 18 to the minimum image 10 degrees) of the execution place (in the case of the execution of a winterer.

It is possible to minimize the decline and expansion that should be concealed of the product in accordance with the actual conditions of use.

* If the temperature of the parts of other days of construction is severe, it is possible to come into red sea or local phenomena, so the construction environment will be satisfied and the state of construction will be met.

B. - At the time of execution - At the same time, the temperature at the time of concealment before the execution does not cause any change in product dimensions due to temperature changes (general type, non-life compensation). C. After the execution, the same temperature shall be maintained for 72 hours after the execution, and when 72 hours are under way, the deterioration of the solar is under way, and the movement of hot materials shall be avoided during the temperature change or the movement of hot materials.

The main time is to maintain the same heating temperature before, during, and after, construction.

In the process of the instant construction, the Plaintiff, the Defendant, and the Intervenor agreed to complete the construction of the glass window of the instant building from February 20, 201 to operate indoor heating, and then construct the Daejeon Preventive Day.