beta
(영문) 서울행정법원 2016.09.22 2016구합52064

개발행위불허가처분취소

Text

1. The disposition that the Defendant rendered to the Plaintiff on July 31, 2015 “the return of the application for development activities” is revoked.

2. The costs of lawsuit shall be.

Reasons

On January 20, 2015, the details and details of the disposition were as follows: (a) on January 20, 2015, the Plaintiff filed an application with the Defendant for permission to engage in a housing construction project with respect to the land of 3,679 square meters (hereinafter referred to as “land subject to a drawing”) located in Seodaemun-gu Seoul, Seodaemun-gu, Seoul (hereinafter referred to as “instant land”).

On the other hand, the road to enter the instant land has the following part of the “current Access Road and Road Description” (hereinafter “the Access Road 1”) and the “section requiring additional extension” (hereinafter “the Access Road 2”) of the drawing.

On the above application, the defendant demanded to supplement the following contents, and the plaintiff submitted the following supplementary plan:

On January 27, 2015 of the Plaintiff’s main contents of the Plaintiff’s supplementary plan to be supplemented - Requests for calculation of an ecological area ratio - Requests for construction early and after construction - Preparation of an ecological area calculation table and submission of drawings - Requests for installation of an erosion control area in February 17, 2015 - Requests for securing a width of 6 meters wide from access roads (which shall be referred to as “road 1 and 2 access roads)” - planned for securing a width of 6 meters from roads (excluding partial installation) - Requests for securing a width of 6 meters on March 30, 2015 - Requests for securing a width of 6 meters from approach pipes and packaging - Requests for measures following an increase of construction density - 140% of the size of the existing site (which shall be 270% of the size of detached houses and 45% of the total area (which shall be 270%) with the exception of the two (30m) roads. - 94% of the size of the road (which shall be adjusted from 270%).280% of the total.1.1.