beta
(영문) 울산지방법원 2017.05.18 2016고단3972

산업안전보건법위반

Text

Defendant

A, B, and C are punished by a fine of KRW 5 million, and Defendant G is punished by a fine of KRW 2 million, Defendant D, E, and F, respectively.

Reasons

Criminal facts

1. The Defendants C Co., Ltd. (hereinafter referred to as the “C”) are employers operating construction equipment manufacturing and selling business in Ulsan-gu, Ulsan-gu, K; Defendant C Co., Ltd. (hereinafter referred to as the “C”), the chief safety and general manager of the headquarters of the construction equipment headquarters; Defendant G Co., Ltd. (hereinafter referred to as the “instant factory”); the safety manager of the two factories that assemble the construction equipment headquarters (hereinafter referred to as the “construction equipment headquarters”); Defendant A, the safety manager within the business owner’s interest who operates the drilling assembly business in the name of L in the name of L; Defendant F’s site warden; Defendant E is L workers; Defendant E’s victim’s site N; Defendant D is N workers.

2. The Defendant C, in the process of assembling the digging machines in progress at the factory in the instant case, contracted to L the installation process of the digging machines center presse (the upper part of the digging machines) and the installation process of the presse pressure strings, respectively.

한편 굴삭기 제조는 센터 프레임 유압 호스 설치 후 굴삭기 언더 커버 장착 순으로 공정이 진행되는데, 이 사건 사고가 발생한 조립 중인 HX145 굴삭기( 이하,‘ 이 사건 굴삭기’ 라 한다) 는 센터 프레임 유압 호스 설치 공정을 완료한 후 굴삭기 언더 커버 공장 라인에 들어가기 전 상태로 언더 커버 장착 대기 장에 주차된 상태였고, L 근로 자인 피해 자가 센터 프레임 유압 호스 설치 과정에서 발생한 하자에 대한 수정작업을 하기 위해 이 사건 굴삭기의 붐 대( 굴삭기의 앞쪽에 설치된 ‘∧’ 모양의 굴삭 작업 부위 중 센터 프레임과 연결된 철 구조물) 와 엔진 후드( 센터 프레임 중 엔진이 설치된 부분) 사이의 공간에서 수정작업을 하고 있던 중 N 근로 자인 피고인 D가 이 사건 굴삭기의 붐 대를 들어 올려 붐 대와 엔진 후드 사이에 피해자가 협착되는 사고가 발생하였다.

3. Defendant A, B, and C [Violation of Industrial Safety and Health Act]

A. Defendant A.