beta
(영문) 대전지방법원서산지원 2019.03.21 2017가합50715

공사대금

Text

1. The Defendant (Counterclaim Plaintiff) paid KRW 391,505,225 to the Plaintiff (Counterclaim Defendant) and its related amount from May 20, 2017 to March 21, 2019.

Reasons

(b)in case of conflict between the terms of the special agreement, the special agreement shall prevail;

1. The down payment of KRW 352,000,000 is the down payment relating to this construction.

2. Profit of 10,000,000 won shall be recovered from the contractor through the guest room marketing protocol while the contractor is performing the work.

3. The authorization and permission for remaining sites shall be received at the expense of the contractor, and 15,00,000 won shall be paid for each authorization and permission by incentives;

(Taxes, such as taxes and public charges, and farmland diversion costs, shall be borne by the landowner. 4. Contract shall be made in Circuit without any separate construction cost.

5. The design licence changes shall be responsible and, if not permitted, shall be responsible in accordance with the existing licence drawings.

7.This project is not a contract owner but a direct project owner.

In order to reduce the value-added tax by 10%, the head of the Tong shall be provided to the Si construction and shall be deposited and withdrawn from the project so that the head of the Tong can be handled by using the head

* Contract Terms and Conditions* The first progress payment: 20% of the contract amount: the second progress payment: 20% of the contract amount (the completion of the structural works): 20% of the contract amount: 20% (the completion of the structural works): 20% (the completion of the structural works) of the contract amount: 20% (the completion of the structural works) of the contract amount: 10% (the completion of the structural works) of the contract amount: 3) : B of December 2016, 2016 and the construction contract related to the C site building (the evidence No. 1-2 and evidence No. 1-2 of the A), 150 days: the contract amount of 150 days in the absolute air: 623,000,000 won directly operated by the Corporation (the additional plan): The contract amount shall be deleted, and the additional contract amount shall be 10% (the additional contract amount shall be excluded) and the additional contract amount shall be excluded.

1. This contract will be concluded with respect to B and C sites, and the construction will be completed by minimizing the interior of the cost of construction in accordance with the contract drawings.

2. The profit of Eul (the plaintiff, hereinafter the same shall apply) shall be operated with B’s penture for a period of six months.