1. The Defendant’s KRW 25,438,049 as well as the Plaintiff’s KRW 5% per annum from July 15, 2017 to January 20, 2021.

Reasons

1. Occurrence of liability for damages;

A. 1) The Defendant is a corporation operating a new renewable energy generation business, etc., and the Plaintiff is an employee employed from October 2015 to work as a person in charge of boiler rooms.

B) The Defendant’s factories working for the Plaintiff divided one building into a drying room and a boiler room. The drying room is a place where machinery, such as heating, disc drying machine, circular cooling machine, and round screening machine, can be connected in order to go through screen conditioning and manufacturing materials such as accelerators, and the boiler room is a place where the boiler room operates boiler in order to produce the string team of high heat necessary for the said construction.

The Plaintiff was employed as a staff member of the boiler room, but the Defendant Company was also engaged in the business of supporting the stoves room from the stoves around the stoves. At the time of the following accident, when the manpower shortage due to the reduction of personnel, the Defendant Company was concurrently engaged in the business of stoves room and the stoves room. In particular, on Saturdays and Sundays, the Plaintiff performed the business of stoves

C) On July 15, 2017, the Plaintiff was living in the peculiar area on Saturdays. At around 10:40 on the same day, around 10:40, when the factory operation was stopped on the wind, which became far away from the lightning in the above factory building, and the repair was completed at 3 p.m. and the repair was completed at 3 p.m., and the repair was resumed, the Plaintiff included the witness’s testimony in each of the following items: (a) on the internal structures, where the Plaintiff, without knowledge that the machinery began to be operated slowly, put the hand onto the opening of the cooling system in order to verify the construction (water content) of the materials loaded in the machinery, etc. (hereinafter “the instant accident”).