(영문) 수원지방법원 2017.08.18 2015가합64271

손해배상(기)

Text

1. The Defendant (Counterclaim Plaintiff) against the Plaintiff (Counterclaim Defendant)

A. Attached Form 1.3, located at the ground level 413-14, e.g., the water village at the e.g., Seosung-si.

Reasons

1. Basic facts

A. The plaintiff is a company engaged in the manufacture, sale and distribution of various industrial gas, and the defendant is a company engaged in building work business and civil engineering work business.

B. 1) On January 3, 2014, the Plaintiff entered into a construction contract with the Defendant, as follows, with a 1,364,100,000 won (a contract deposit of KRW 272,820,00,000) (a balance of KRW 1,091,280,000) and the Plaintiff’s possession of the Plaintiff, Hosung-dong-si, Youngcheon-si, Youngcheon-si, 506-1 (hereinafter “Yung-si”)

) A construction contract was concluded for removal of obstacles, the contents of which include removal of obstacles, installation, and sale of waste cables (hereinafter “the first construction contract”).

Article 2 (Scope) The scope of obstacles to be removed by the Defendant under this Agreement shall be limited to the obstacles described in the list of separate specifications and removal targets except for floor, concrete structures, retaining walls, and retaining walls among the facilities owned by the Plaintiff installed in the interest plant. The Defendant shall purchase the obstacles to the items designated by the Plaintiff from among the scrap metal, non-refinite and other recycled products arising out of the obstacles in accordance with this Agreement, and the payment therefor shall be in accordance with Article 5. The Defendant shall pay the Plaintiff, in cash, the amount set off against the cost of removal and disposal of wastes from the proceeds of the sale of scrap metal and non-refinites set forth in Article 2. Within three days after the conclusion of the contract, the remainder of KRW 1,091,280,000, KRW 300, KRW 280, KRW 2000, KRW 2000, KRW 800, KRW 280, KRW 200, KRW 29675, KRW 209, KRW 2005, KRW 29675,5675, etc.

The term "the second construction contract" is "the second construction contract", and the term "the first construction contract" is "the total.