A and D KRW 2 million for each fine of KRW 2 million, KRW 3 million for Defendant B, and KRW 1 million for Defendant C.

Reasons

Punishment of the crime

Defendant

A, Defendant B, Defendant C, Defendant D, and Defendant D were engaged in the repair business of sadtons in the building located in H in the East Sea and engaged in missionary activities with profits therefrom. Defendant F and Defendant G were employed as employees of J Co., Ltd. (hereinafter “J”) at the same time in the East Sea, and Defendant F were working as the head of the Safety Team, and Defendant G was working as the head of the Construction Team.

1. The Defendants who interfere with one’s duty on September 28, 2016 (Defendant A and Defendant B) shall not engage in the work within 100 meters around our house for the purpose of obstructing the formation of a flooded area being performed by the victim J as part of the construction of the aforementioned L complex around September 28, 2016 by the victim JJ as part of the construction of the same L complex.

“Along with sound, Defendant B could not carry out excavation work for about 1 hour and 20 minutes by entering the clacker work in the clacker line.

As a result, the Defendants conspired to interfere with the work of the injured party by force.

2. On October 11, 2016, the Defendant obstructed (Defendant B) from running a one ton truck at the entrance of the access road and parked the construction vehicle on October 11, 2016 at the entrance of the access road installed adjacent to the I located adjacent to the H on November 11, 2016 in the East Sea, with a view to obstructing the victim J from operating the sprinking work being performed as part of the L complex construction.

Accordingly, the defendant interfered with the work of the damaged party by force.

3. From October 12, 2016, Defendants D, B, and A (Defendant D, Defendant B), who interfered with one’s own business on October 12, 2016, for the purpose of obstructing the removal of M buildings that the victim J was performing as part of L complex construction in front of the M Building at the time of the East Sea around 13:00 on October 12, 2016, Defendant D was unable to perform the work.

“A person shall prevent the operation of a refracker by blocking the front of the refracker, and Defendant B shall add it to this.