폭력행위등처벌에관한법률위반(공동재물손괴등)등
A defendant shall be punished by imprisonment for not more than ten months.
except that the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.
Punishment of the crime
[Criminal Power] On February 1, 2013, the Defendant was sentenced to imprisonment with prison labor for a violation of the Punishment of Violences, etc. Act (a collective weapon, etc.) at the Jeju District Court on February 1, 2013 and one year and six months.
4.26. The above judgment became final and conclusive.
【Criminal Facts】
1. Around September 14, 2012, the Defendant violated the Punishment of Violences, etc. Act (joint destruction and damage, etc. of property) committed damage to the entrance and the gate by setting the strings before the entrance of the DD construction site located in Seopopopo City, Seopopopo City, with the strings of the re-entry and re-entry doors installed by the victim E company and the strings of the strings.
Accordingly, the defendant damaged another's property in collaboration with the injured party.
2. On August 15, 2012, at around 19:10, the Defendant discovered that the victim F (the age of 27) calls from a broadcast vehicle used by an organization opposing D construction works on the roads adjacent to the main entrance and exit of D construction works located in Seopopo City C, Seopopopo City, and caused the victim to have the tamp the victim’s spath and spath, thereby causing approximately 10 days medical treatment to the victim.
3. Interference with business;
A. On August 12, 2012, around 15:06, at the entrance of the DD Construction Project Association located in Seocho-si, G Co., Ltd., a subcontractor, under the management of E Co., Ltd., a contractor of the said construction work, and H Co., Ltd., and H Co., Ltd were working for the establishment and use of facilities and the establishment of manufacturing process and the establishment of the K-U-K basic construction work. For the purpose of concrete building theory necessary for the work, the construction vehicles, including J-U-K, under the I’s jurisdiction
At this time, the Defendant, along with K, L, M, N,O, P, Q, etc. from that time to 15:35 on the same day, obstructed the construction site from the construction site to the 29 minutes from that time, from 15:51 on the same day to 18:19 on the same day.
As a result, the defendant is a victim E corporation and partner company, who is a contractor, by making it difficult to operate construction vehicles, such as 2 to 57 minutes and 57 minutes by force in collaboration with the above K, etc.