(영문) 청주지방법원 2015.02.12 2013가합26729

시설물 철거 등

Text

1. As to the real estate listed in the separate sheet No. 1 for the plaintiffs, Defendant I indicated in the separate sheet No. 2,

(a) 9, 3 through 5;

Reasons

1. Grounds for claim;

A. Facts of recognition 1) The Plaintiffs are real estate listed in the separate sheet No. 1 list (hereinafter “instant building”).

Of the 6021, 6023, 6050, 6024, 6027, 6022, 6060, and 6025 of the building of this case, each of the sectional owners is the defendant I. The rest of the store except the above stores owned by the plaintiffs among the 6th floor of the building of this case is divided ownership or leased and operated as "J" (hereinafter referred to as "projected land of this case").

(2) Defendant I is ordered to do so under Section 1-C.

In each part of the port (hereinafter referred to as the “instant passage, etc.”) the facilities, etc. are installed as follows, or used as a passage within the land for the purpose of use in the instant cover, and the passage, etc. of this case is used for the business of the land for the instant cover.

Attached Form

The connected part of 9, 3, or 9 square meters on the map for the purpose of using the area indicated in the map 1, 23, 9 through 13, and 10-2, the connected part of 13 through 16, 27, 19, 20, 28, 29, 41 through 50, 32, 36, 36, 36, 32, 37, 47, 44, connected part of each of 5 square meters connected to 36, 47, 46, 47, 46, 36, 32, 37, 47, 24, 24, 24, 36, 36, 32, 3000 square meters, 36,0000,000 connected part of each of 3,000 square meters connected to 35,000 square meters, 46,000.