보험금
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. Basic facts
A. On December 15, 2010, the Plaintiff and the Plaintiff’s attached B entered into a lease agreement with C to lease part of the first floor of the second class neighborhood living facilities and the second class neighborhood living facilities with the second class neighborhood living facilities with the second class neighborhood living facilities with the second class 405.48m2, and the second class 568,19m2 (hereinafter “instant building”), which are owned by the Plaintiff and the Plaintiff’s attached facilities. The Plaintiff operated an oriental medicine bank with the trade name of “E”, while B operated an oriental medicine bank with the trade name of “F”.
(hereinafter referred to as “E” and “F” of the above herb bank operated by the Plaintiff
From February 8, 2011 to February 8, 2014, the Plaintiff entered into a fire-fighting liability insurance contract with the Defendant with the content of the insurance period as “E” (hereinafter “instant first insurance contract”). B around February 23, 2011, the Plaintiff entered into a contract with the Defendant for fire-fighting property liability insurance with the content of the insurance period as “E” (hereinafter “instant second insurance contract”). From February 23, 2011 to February 23, 2011, the Plaintiff entered into the contract with the Defendant for fire-fighting property liability insurance with the content of the insurance period as “F,” “F,” and the insurance amount as KRW 10,000,000.
C. The details and amount of each of the guarantees stipulated in the first insurance contract of this case are as follows.
The details of the No. 1 security (original guarantee) security deposit amount: direct damage, fire-fighting and escape damage caused by fire No. 120,000 - No. 120,000 - No. 120,000 for each object, compensation for actual loss within the subscription amount, expenses for dismantling the remainder in the site of a fire in the event of a fire, expenses for cleaning and expenses for loading the remainder in the case of an accident to 10% of the amount of damage, 20,000 for the interior facilities of No. 20,000 for the first - 3 goods/ semi-finished goods of No. 5 10,000 for the first 4 machinery/ No. 10,000 for the first - No. 10,000 for the five collective equipment of No. 6 internal explosion risk security at 165,000,000 for the first 70,000 for the injury or loss of the insured as security deposit.