(영문) 청주지방법원 제천지원 2017.04.20 2016가단21274

손해배상(산)

Text

1. The Defendant: (a) against Plaintiff A, KRW 23,214,286, and KRW 13,392,857 for each of the said KRW and each of the said KRW 13,392,857 for each of the said KRW and each of the said KRW to Plaintiff B and C.

Reasons

1. Basic facts

A. D has been employed by the Defendant on January 2, 2012, and has worked in the Defendant’s construction site (hereinafter “instant site”) located in Chungcheongnam-gun, Chungcheongnam-do.

B. At the instant site, on February 21, 2013, cement minl (hereinafter “instant minl”) with a volume of 80 tons set on the floor of the floor was conducted to put the cement minl with a height of 2 meters from the floor on the floor (two walls with a height of 2 meters are installed at regular intervals, and several structures are installed to put in the upper part of the inner part of both walls, such as the instant minl, and to move goods by placing heavy objects above the original body, such as the instant minl. The large form is the same as the drawings).

(hereinafter referred to as the “instant work.” A variety of steel agents with a 50-meter thicks from the instant construction before the instant construction work were connected with each other by a connectors after the instant crushing machine surrounding the instant crushing machine, and Cracks down on the instant crushinger with steel agents surrounding the instant crushing machine.

F et al., the Defendant’s workers, et al. dismantled the connection of the steel stringer’s wall to the steel string, and D, in the process of dismantling the steel string, removed the steel string so that the steel string does not string the steel string, and removed the steel strings from the wall surface of the stringer, which was at the top of the stringer’s wall string, fell into the bottom below 2 meters.

(hereinafter referred to as “instant fall accident”). C.

D due to the instant fall accident, D suffered injury, such as the closure frame of the left-hand vision, the diversification of the whole-hand part of the front-hand part, the closure frame of the lower-hand part, the closure frame of the lower-hand part, and the lower-hand part of the lower-hand part (hereinafter “instant injury”), and four months from the same date until June 21, 2013.