손해배상(기)
1. The defendants jointly do so.
3. The “Plaintiff” column for “amount of damages recognition” falls under each Plaintiff.
1. Basic facts
(1) The plaintiffs are the owners or residents of each unit of OBL (hereinafter referred to as the "Plaintiff LBC") with five floors above the Seo-gu Busan, Seo-gu, Busan, as indicated below.
Whether the Plaintiff is the owner of the several houses or not, A A 201 ox 202 ox 202 ox 3 C 301 o (Transfer on July 5, 2003) 4 D 302 ox 5 E 501 o (Transfer on October 31, 201) 6 F 502 o (Transfer on March 29, 201) 7 G 601 o (Transfer on March 29, 201) 7 H 601 ox 602 Ox 9 I 201 o (Transfer on October 31, 201) 10 J 302 o (Transfer on October 31, 201) 601 Do 60302 o (Lease on October 21, 2015) 2015.
B. The Defendant M&D building C unit (hereinafter “Defendant building”) was newly built on each of the above lands, which is the main complex building with the 10.8m to 11.43m in the south of the Plaintiff P, Seo-gu, Busan, which is the Defendant M&, with the distance of approximately KRW 10.8m to 11.43m..
Defendant Hwon Construction Co., Ltd. (hereinafter “Defendant Co., Ltd”) is the contractor who was awarded a contract from Defendant M to construct the Defendant’s building (hereinafter “instant construction”).
【Defendant Company started the instant new construction from March 2014, and completed the structural construction around December 2014, and the Defendant Building was approved by the competent authority on April 27, 2015.
m. As a result of the construction of the Defendant building, the changes in the sunlighting hours (the total of the sunlighting hours during the eight hours between 8:00 and 16:00 on the basis of the wintering day) and continuous sunlighting hours (the continuous sunlighting hours during the six hours between 9:0 and 15:00) between the Plaintiff’s Borrowing is annexed.
2. The phrase “before new construction” and “after new construction” are as follows:
(v) the Plaintiff’s loan and the Defendant’s building are located in the general commercial area, and around that area there are the Defendant’s building and the urban-type residential housing of the 8th floor size, and T apartment of the 15th floor size, and are the 10th floor size adjacent to Plaintiff’s loan.