(영문) 서울행정법원 2018.11.30 2018구합58622

유족급여및장의비지급처분취소

Text

1. The Defendant’s disposition of paying survivors’ benefits and funeral expenses to A on January 11, 2018, designating a business owner as the Plaintiff.

Reasons

1. Details of the disposition;

가. 원고는 토목건축공사업, 전기공사업, 준설공사업 등을 영위하는 법인이고, 주식회사 코리아카코(이하 ‘코리아카코’라 한다)는 토목건축공사업 등을 영위하는 법인이다.

B. On June 22, 2017, B Co., Ltd. (hereinafter “B”) concluded a contract with the Plaintiff under which the construction period was “from June 22, 2017 to September 22, 2017” and the construction period was “from June 22, 2017 to “from September 22, 2017,” and concluded a new contract with the Seoul Gangnam-gu Seoul Metropolitan Government, Gangnam-gu, D, and E (hereinafter “instant building”) to undertake construction works to remove the upper floor (hereinafter “soil removal works”). (c) On September 21, 2017, B entered into a new contract with the Plaintiff for construction works to remove the lower floor part of the said building (hereinafter “ underground floor removal works”) and the construction works to newly construct multi-family housing on the said land.”

On October 30, 2017, the Plaintiff entered into a contract with Mcheon Construction Co., Ltd. (hereinafter “Macheon Construction”) under which the construction period was “from October 30, 2017 to February 28, 2019” and entered into a contract to subcontract part of the construction works of the said multi-family housing (civil engineering works, etc.). In addition, the Plaintiff entered into a contract with Korea Co., Ltd and the construction period on December 15, 2017, stipulating that “from December 15, 2017 to March 31, 2019” (hereinafter “subcontract subcontract for underground floor removal works”).

E. On November 7, 2017, the net F, Korea’s employees (hereinafter “the network”) refers to the temporary columns installed on the lower floor in order to prevent the collapse of the structure due to the weight of heavy equipment, etc. and vibration, along with the East F, belonging to Korea’s carcers on the first floor of the instant building on November 7, 2017. During the course of carrying out the work of moving B, jack F, which is written with the jack Sk F, which is located on the lower floor.