(영문) 대구고등법원 2013.10.16 2012나20667

손해배상(기)

Text

1. The plaintiff's appeal against the defendants is dismissed in entirety.

2. The costs of appeal shall be borne by the Plaintiff.

purport, purport, and.

Reasons

1. Basic facts

A. The Plaintiff is a person engaged in the carpet sales business with the trade name of “C”, and is the owner of a building of lightweight aggregate steel-frame structure and brick structure on the ground D in Yongcheon-si D, and a building of 372m2m2 (hereinafter “Adong building”) above ground, such as the building of lightweight flus roof 372m2m2 on the ground (hereinafter “B-dong building”), and the above building A and Dong B combined with the above building “B-dong building,” and the Defendant B is a person engaged in the livestock industry in Youngcheon-si J in Youngcheon-si, and the Defendant B installed a remedy station on each side of the building of this case and installed an electric measuring instruments (hereinafter “the instant measuring instruments”) with electricity necessary for its operation installed on the side of the building A-dong building and 26m26m2 (hereinafter “K Livestock farmers”).

B. The Defendant Korea Electric Power Corporation (hereinafter “Defendant Korea Electric Power Corporation”) had failed to pay the electric charges for each of the instant buildings from August 2010 to March 3, 2010. On November 1, 2010, Defendant Korea Electric Power Corporation separated the electric wires sealed by the instant electric wires installed on the outer wall of the building Adong Building, and took measures for cutting off the instant buildings by sealing the electric meters.

C. Around December 1, 2010, K Livestock farmers, including Defendant B, decided to install a quarantine center in front of each road of the instant building in order to prevent the foot-and-mouth spreaded at the time.

Accordingly, among K Livestock Farm Co., Ltd., after removing the seals of the instant measuring instrument for the first time and connecting electric wires to the electric circuit breaker (e.g., passing through the iron plate in the shape of the sub-presidential type above the road, leading to the electric installation of the Road Construction Stacker Station) from the instant measuring instrument, electricity was supplied to the said quarantine station.

(E) On January 16, 2012, Daegu District Court Decision 201 High Court Decision 201Da24880 Decided January 16, 201, notified each of the fines of KRW 1 million. The livestock farmers thereafter.