손해배상(자)
1. The instant lawsuit shall be dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. Basic facts
A. On December 25, 2012, at around 17:50 on December 25, 2012, C’s driver D, a driver of C Co., Ltd. (hereinafter “C”), driving a bus (hereinafter “instant bus”), was in violation of the signal at the shooting distance from G elementary school located in Songpa-gu Seoul, Seoul, and was in contact with the driver on which the crosswalk was cut and was rapided. As a result, the Plaintiff on the instant bus, who was in operation of the bus, suffered from the injury, such as the right shoulder, the right shoulder, the right shoulder, the dume, the dume, etc., on the right shoulder, which requires treatment for about two weeks.
(hereinafter “instant accident”). B.
The Plaintiff received medical treatment from H hospital from December 26, 2012 to December 28, 2012, from the Imology from December 29, 2012 to January 7, 2013, from the Jamwon from January 9, 2013 to February 15, 2013.
C. The Defendant is a mutual aid business entity that entered into a mutual aid agreement with C, and the Defendant was up to March 22, 2013.
The plaintiff paid 969,010 won in total to the hospital or the plaintiff treated.
On March 20, 2013, the Plaintiff is an agreed amount from the Defendant to “all legal damages (including medical expenses to be borne)”.
In addition to the amount stated in paragraph (1), the defendant who received 820,000 won in addition to the amount stated in this paragraph, and the defendant who represented C and the defendant who renounced all rights to the damage caused by the accident in this case and did not file a civil or criminal lawsuit or objection (hereinafter “instant agreement”).
E. On May 21, 2013, the Plaintiff was diagnosed by K Hospital as “Woman Quak Matum kneon and tension on the left shoulder, the right-hand kneon salt, the right-hand kneon salt, the left-hand knicker knicker, the left-hand knicker Quaker Matum, and the knicke in both sides,” and was hospitalized from June 20, 2013 to July 4, 2013.
From March 13, 2014 to April 1, 2014, the Plaintiff’s Plaintiff’s tin of the surrounding land and power lines of the two sides of the two sides, the heat, and the right shoulder at K Hospital.