(영문) 서울남부지방법원 2020.10.08 2020나50018

부당이득금

Text

The plaintiff's appeal is dismissed.

Expenses for appeal shall be borne by the plaintiff.

Purport of claim and appeal

purport.

Reasons

(a) have been connected at any place;

It should have confirmed the place of work together at the work site, but it should be recognized that it was wrong due to a failure.

On March 24, 2017, after being discovered in the process of the electric inspection, the electrical inspection agent corrected the same on the day.

If a reasonable claim for damages is filed, it shall be notified that it will be processed.

“The content-certified mail sent.” (f) On January 9, 2018, the Plaintiff’s representative sent a content-certified mail to the Defendant, at the request of the Steering Committee to compute the electrical use of the Defendant’s private teaching institute’s private teaching institute without permission from the time of occupancy:

‘A' sent content-certified mail.

Data on calculation of the amount of electricity used without permission are 16,629,74 won in total (14,379,379,390 won in total) 5,392,280 won in total (14,379,390 won in total) 5,392,280 won in total (14,379,390 won in total 72/72 months in total 1 month in total) * 27 months (no month in which data are available) * (no month in which data are available)

4. Total amount to be used without permission: 22,022,000 won (13).

G. On January 29, 2018, the Defendant sent to the Plaintiff’s representative, “The Defendant did not make any operation on the electrical boat,” or “if the electrical boat is erroneous, the Defendant shall be held responsible to the business entity that performed the separation work and the head of the management office that controlled and supervised the work,” and “only the operation meeting shall be held without confirmation, and the act that unilaterally takes place to the illegal electricity user cannot use it.”

H. Meanwhile, in the Plaintiff’s side, the Defendant: “The Defendant used approximately KRW 210,377 km electricity without permission in a way that directly connects electric wires installed at the fifth floor of the instant building from April 1, 2008 to March 24, 2017 to the blocking machine without passing through a measuring instrument.”