(영문) 서울고등법원 2015.06.12 2013나70837

공사대금 등

Text

1. Of the part of the judgment of the first instance, the part against the Defendant (Counterclaim Defendant) regarding the main lawsuit is KRW 105,64,76.

Reasons

. 1,575,785 6 4. The difference between the construction cost of the two 1,748,11 71 7. The difference between the construction cost of the two 1,748,118 1,6219 4. The difference between the construction cost of the 1,57 25,148 25,148 7. The difference between the construction cost of the 1,75 200 5 6. The difference between the construction cost of the 1,75 20 5 6 5 . The difference between the construction cost of the 1,57 20 5 . The appraisal cost of the floor and the 20 5 5 . The removal of the removal of the removal 1,847 196 . the difference between the construction cost of the 20 5 5 6 . The removal 165 6 . The removal 166 7 84 . the removal 16 6 8 5 .