(영문) 제주지방법원 2016.10.19 2016고단1296
업무방해등
Text

Defendant shall be punished by a fine of KRW 4,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

"2016 Highest 1296"

1. Interference with business;

A. On March 13, 2016, around March 13, 2016, the Defendant interfered with the business, on the ground that the victim D was unable to receive the roof construction cost at the construction site in Jeju-si, E-dowon, managed by the victim D on March 17, 2016, thereby obstructing the victim from carrying a container owned by the Defendant at the entrance of the construction site, thereby preventing the victim from carrying the victim’s container at the end of the construction site, thereby obstructing the victim from carrying out construction.

B. On March 14, 2016, the Defendant interfered with business affairs, around March 14, 2016, obstructed the victim’s work of construction of the original building by force, by putting six hardware at the entrance of the original building at the construction site of the Dogwon, for the same reasons as the preceding paragraph, on March 13:40, 2016, preventing the victim from entering the building at the site of the Dogwon, thereby obstructing the victim’s work.

2. The Defendant damaged the victim’s property by falling away from two sides of the construction site outer walls at the construction site, respectively, on the date and time indicated in paragraph 1(b), and the yellow presses in which he possessed at the construction site.

"2016, 461"

1. The damage of property, and the insult Defendant: (a) around September 26, 2015, at the site of the construction of the “E” flag source located in Jeju-si, the victim F.C; (b) on the glass of the said flag source building using the color frame, “a person entering and leaving the building of the said flag site” using the color frame, “a person entering and leaving the building of the said flag site”; and (c) “a person leaving the building of the artificial garbage G, each of their own hump and each of their own humb humb G, thereby impairing the usefulness of the glass of the flag source building owned by the victim; and (d) made a public insult of the victim.

2. Violation of the Punishment of Violences, etc. Act (joint property destruction and damage);

A. On October 17, 2015, the Defendant: (a) at the site of the said “E” construction around October 17, 2015; and (b) on the ground that he/she exercised the right of retention on a design building, and (c) in order to prevent the entry of the press staff members, such as the Victim F, etc., by the Defendant, to H, I, and J, the father of the building.