(영문) 인천지방법원 2015.09.16 2014가단28885
부당이득금
Text

1. The Defendant’s KRW 80,000,000 and its amount are 5% per annum from August 11, 2010 to March 26, 2014 to the Plaintiff.

Reasons

Basic Facts

A. The Defendant entered into a contract for design, construction and supervision as follows with respect to the Maamdo Reservoir Construction Co., Ltd. (hereinafter “Domination”), Co., Ltd. (hereinafter “Domination”), Co., Ltd. (hereinafter “Stru”) (hereinafter “Stru”), the Plaintiff, Cable Construction Co., Ltd. (Seoul District Court Decision 2009 Mohap15) on May 6, 2009. The following Cable Construction Co., Ltd. (hereinafter “Cable Construction Co., Ltd.”) as follows:

(1) On December 3, 2001 from May 24, 2001 to October 23, 2001, the Plaintiff and the rehabilitation company (joint supply company) entered into a contract for construction works on December 26, 2001. The Plaintiff and the rehabilitation company (joint supply company) entered into a contract for supervision services for 730 days after the beginning of the first 365th day after the beginning of the 365th day on December 26, 201, the total contract amount of the beneficiary (the original contract amount) contract period (the original contract amount) contract period (the original contract amount). The Plaintiff and the beneficiaries, including the Plaintiff, were changed. The Plaintiff and the rehabilitation company entered into a contract for construction works from May 24, 2001 to October 23, 2001.

The construction of this case was completed August 30, 2004 as the construction of structures, such as drainage pumps facilities, which have three drainage pumps and three drainage pumps, at the bank which divides the brain head and the sprink, and the sea of the west Sea, in order to prevent flood damage in the Seo-gu Incheon, Seo-gu, Incheon, the area surrounding the Seoul Metropolitan Area Reclamation area, and Kimpo-si, Kimpo-si.

C. On September 25, 2009, after the completion of the instant construction, the marbing phenomenon in the detention basin (e.g., the water length in the form of pipe inside and outside the bank, moving to low water pressure due to the water level difference inside and outside the bank and the hydrotensions, and the ground is destroyed due to the sarbing of earth and sand) occurred, and new installation of a bank, the marbing bank adjacent to the coast road using the bank and the embankment, and the marbing phenomenon occurred due to some earth and sand on the coast.