logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울서부지방법원 2020.04.21 2019가단14076
건물철거 및 토지인도
Text

1. The Defendant indicated in the attached Form No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, among the land of Seodaemun-gu Seoul Metropolitan Government 3,695 square meters of forest land C, Seodaemun-gu, Seoul, the Plaintiff.

Reasons

Attached Form

The entry of the cause of the claim may be recognized in full view of the whole purport of the pleadings in each entry in Gap evidence of subparagraphs 1 through 3 (including each number), or there is no dispute between the parties.

Therefore, the Defendant is obligated to remove the Plaintiff’s claim in sequence 19, 20, 20, 200, 200, 3, 4, 5, 6, 7, 8, 9, 10, and 11 of the attached drawings among the land of Seodaemun-gu Seoul Special Metropolitan City 3,695 square meters among the land of Seodaemun-gu 3, Seoul, and 3,000 square meters, each of which is linked with the 37.5 square meters above the 11, 12, 13, 14, and 11 of the attached drawings, and the 4.2 square meters above the ground pipe roof of the line connected each of which is linked each of the 4.2 square meters above the 15, 16, 17, 18, and 15 square meters above the above drawings, and the Plaintiff’s claim for delivery of the 1.3 square meters above the ground 19,201, 2213, 229.

arrow