(영문) 대전지방법원 2016.01.13 2015구합102308
보조금교부결정취소등 취소 청구의소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. The Plaintiff, around March 8, 2007, installed the first plastic greenhouse in 2009, shall be 23,008 square meters of C forest land in Chungcheongnam-gun, Chungcheongnam-nam from the Defendant (hereinafter “the instant forest land”).

(2) On April 17, 2008, the Plaintiff filed an application for a subsidy with the Defendant on April 17, 2008, for a subsidy of KRW 800,00,00,00,000 for each type of permission (the purpose of which is 0.3 square meters for each type of permission (the use) on the details of 1,131 square meters of land for 1,000 square meters of land for each type of permission (the purpose of which is 0.9 square meters of land for 2.3 square meters of land for a forest zone, Chungcheongnam-gun, Chungcheongnam-gun, Chungcheongnam-gun, and all remaining copies of land for each type of permission (the purpose of which is 4.3 square meters of land for night tree planting, forest tending), including 1,131 square meters of land for a period of permission, and the Defendant filed an application for a subsidy with the Defendant on April 25, 2008.

E F G G G forestry map

2. Purposes and details of the project for the project: The purpose of 1.3 plenary session development project: The details of creating substitute trees for the fest tree cultivation land at night, in which no economic feasibility exists and is closed: D, office, reduction, and trend.

5. On April 5, 2008: On December 3, 2008, the date of the commencement of the project: 2008, the Plaintiff: (a) was planting part of the instant forest by using the above subsidies, etc.; and (b) around February 2009, the Plaintiff was a vinyl 2 dong (area: 531 square meters; hereinafter referred to as “the first vinyl house”) to grow D on the lower bridge between the north E forest and the instant forest among the instant forest.

(B) Around 2011, the Plaintiff established the second plastic greenhouse in 2011. (1) Around 2011, the Plaintiff applied for the grant of subsidies of KRW 5,390,000,000, out of the forest land of this case, to the “B Support Project” implemented by the Defendant, as follows. The Defendant decided to grant subsidies of KRW 5,390,000, around November 3, 2011.

2. Objectives and content of the delivery: The purpose of the B support project: 6,620 square meters: Details of the establishment of a stable production system through the support of production facilities of forest products: The second Plaintiff, such as plastic houses necessary for the original woodD cultivation and firesaw cultivation, shall be around January 2012.