(영문) 광주지방법원 2019.12.19 2019가합52
공사대금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

(b) receive all the stipulated construction costs;

The instant parking lot construction was completed on May 11, 2018.

E. 1) On March 27, 2018, the Defendant: (a) each of the following descriptions (hereinafter referred to as “each of the first notes of this case”).

1) Each letter is drawn up and delivered to the Plaintiff. 1) Defendant Representative F and the actual owner G are as follows:

Among the H Corporation on the instant land, KRW 300 million out of the construction cost that the Plaintiff did not receive shall be immediately granted to the Plaintiff at the time of receiving the loan amounting to KRW 15 billion from the Defendant.

2) If the content of sub-paragraph (i) is not fulfilled, the remainder of the total construction cost for the instant land will not be raised any objection even if the action is immediately pending.

3) In the event of the third construction works in the Defendant, the construction cost of KRW 1 million per ordinary construction cost shall be ordered to the Plaintiff, except for electricity, facilities, and communications, and the contract shall be entered into in accordance with the standard construction contract in accordance with the standards corresponding to the contract of the government office.

Each letter of order of the plaintiff representative director: The defendant representative director's order office: The project owner's order office shall complete the project for the construction project's ground-based customer parking lot (ground-to-ground structure building) ordered by the plaintiff to the plaintiff by March 30, 2018, and the completion of the project before completion shall be completed by April 13, 2018.

After the completion of approval for use, the construction of the second floor lamps, concrete string construction, Kdong connection construction, internal office of the outer wall board board construction, smoking room, etc. shall be completed within one month after completion of construction.

When the completion of the above period is known, each letter drawn up from the defendant as of March 27, 2018 shall not be valid.

In addition, the Corporation.