(영문) 서울중앙지방법원 2017.11.13 2017가단5126340
구상금
Text

1. The Defendants jointly share KRW 21,400,879 with respect to the Plaintiff and the period from May 31, 2017 to November 13, 2017.

Reasons

1. Basic facts

A. On January 5, 2017 to January 5, 2018, the Plaintiff entered into a fire insurance contract with respect to the Daegu-gu Factory Building, Machinery, Facilities, etc. (hereinafter “instant building”) with B (hereinafter “instant insurance contract”) with the insurance coverage amounting to KRW 361,50,60,00 (hereinafter “instant insurance contract”).

B. On February 26, 2017, on Sundays 12:10, a fire occurred in the second floor of the E-factory operated by Defendant A (hereinafter “instant factory”) located in Daegu-gu, Seo-gu (hereinafter “instant factory”) located in the vicinity of the instant factory, and the second floor was destroyed, and a fire accident was caused by fire in some parts of the instant building attached to the instant factory, and machinery, office equipment, and neighboring buildings, which are destroyed by fire.

(hereinafter “instant fire”). C.

The results of the fire site investigation of the fire department in charge shall be as follows:

The defendant A stated that he did not work after the business until 14 hours prior to the occurrence of the fire. It was presumed that the second floor of the factory of this case was first launched in the color studs of the factory of this case, and that the combustion of nearby FF and four factories has been expanded due to the numerous combustible materials inside the above factory. The possibility of fire prevention was confirmed to have been electric power failure: electricity failure; as a result of the verification ofCCTV, the color straws presumed to have been operated at the first point of combustion were operated for about 20 hours; but multiple electric wires such as electric lights and drying machines in color straws were identified as the first direct source, but it is not somewhat reasonable in terms of the first direct source, and the electrical combustion straws discovered by joint strawing request state and appraisal cargo. The mechanical factors: The mechanical factors were not prevented from the use of the color straws on the manual, but all of them were not operated at the time of supplying at least 10 minutes after the supply of electricity.