logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울행정법원 2015.04.16 2014구합69815
차별시정재심처분취소 청구의 소
Text

1. The plaintiff (appointed)'s claim is dismissed.

2. The costs of litigation shall include parts resulting from the participation.

Reasons

(1) The amount of the annual salary system under Article 2 (Remuneration, etc.) shall be 18,645,00 won and 1) the amount of the wages of the parties to the contract (E) shall be as follows:

1. Monthly salary: 1,130,000 won;

2. Bonuses: 450% bonus, annual bonus, leave expenses, family members, continuous service, and overtime allowances shall be paid in accordance with a collective agreement. The place of work under Article 5 (Work Place) shall be the manufacturing management division: Provided, That the duties of Article 6 (Work in Charge) shall be secondary materials, and the duties of Article 6 (Work in Charge) may be changed if there are inevitable circumstances in the course of the duties, and the duties of Article 6 (Work in Charge) may be changed if there are inevitable circumstances in the course of the duties. The content of the employment contract entered into between the plaintiff, the selected person, D, and E shall be as follows: The duties of the plaintiff, the appointed person, the D, and E, and the duties and detailed performance of the duties are as follows; the duties of the plaintiff, the designated person in charge of assisting materials from the plaintiff, the designated person in charge of subsidiary materials from the date of performing the duties of production to the date of production of subsidiary materials from 20.10 to 21.21.21 to 24.21.216

In addition, it is not possible to place an order for subsidiary materials, manage customers, manage inventory, etc.

The work of entering and leaving secondary materials is the work of transporting and arranging secondary materials ordered by D, F, and E to warehouse when they arrive, using loans and lending, and productionra's input work is the work of transporting and disposing of secondary materials to productionra in accordance with instructions of D, F, and E after weighing secondary materials according to instructions of D, F, and E.

The main place of work is a storage of raw materials.

Under the direction and supervision of F, a person in charge of the designated raw materials, the person in charge of the raw materials used to perform the duties of raw material entry and management, referring to the volume and production called.

other than.

arrow