beta
(영문) 서울고등법원 2018.10.11 2018누51609

시정명령등취소

Text

1. Attached Form 2, which the Defendant concluded with the Fair Trade Commission Resolution No. 2015-251 dated July 20, 2015, to the Plaintiff.

Reasons

1. Facts of recognition and details of disposition [based on recognition] without dispute, Gap evidence Nos. 1, 2, 10 through 13, Eul evidence Nos. 1 through 20, and 31 (including branch numbers if any), the purport of the whole pleadings;

A. The status of 22 companies, including the Plaintiff, etc., is omitted in the name of the Plaintiff, 22 companies, and the name of the company “stock company” is omitted.

(i)Modern Construction, KS Construction, Hyundai Heavy Industries, Modern Heavy Industries, Samsung Heavy Industries, Samsung Water Industries, Samsung Products Construction, TS construction, gold industry, Hanyang and Tym construction (hereinafter referred to as “existing twelve buildings”).

(ii) dopco, dopco, Gyeongnam company, new, Pacific Construction, Pacific Construction Industry, Dog Construction, Dog Construction, Dog Construction, sc Engineering, Treatment Engineering (Revised Trade Name): Posc Engineering), new comprehensive construction (hereinafter existing performance 12 copies and 22 copies, including the Plaintiff, etc.).

) The Monopoly Regulation and Fair Trade Act (hereinafter “Fair Trade Act”) as a person engaging in a construction business.

) The business entity is a business entity under Article 2 subparag. 1. The Plaintiff’s general status (base: the end of 2014, unit: KRW 00,000) of the Plaintiff’s general status (base: the end of 2014, unit: KRW 2014) as of the date of establishment of net income for the net income for the total amount of capital, 2014 Plaintiffs 49, 777 19, 4025, 835 △△276, 690, 279, 681, 66,133, 195

B. On May 21, 2009, the bid method 2009 - On May 21, 2009, 2009, the minimum bid bid method of major pipelines construction on the date of the public tender notice of construction section 2009 - main pipelines construction on April 21, 2009, the construction of major pipelines - in the echeon-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak-Wak.