beta
(영문) 대구지방법원 서부지원 2018.02.27 2015가단33131

손해배상(기)

Text

1. The Defendant’s KRW 20,000,000 as well as the Plaintiff’s annual rate of KRW 5% from April 18, 2015 to February 27, 2018.

Reasons

1. The following facts may be found either in dispute between the parties or in full view of Gap evidence 1 to 10, Eul evidence 12 to 15, Eul evidence 1 to 4 (including the number; hereinafter the same shall apply) or images, the results of the commission of the delivery of each document to the west of the Daegu District Prosecutors' Office, the west of the Daegu District Prosecutors' Office, the west of the Daegu District Court, the results of the expert witness C's testimony, the results of the expert witness D's appraisal, and the overall purport of the pleadings.

The Plaintiff is a company that develops, produces, and sells “E” (hereinafter referred to as “E devices”) that has the effect of removing pollutants on the surface of materials, such as removing pollutants on the surface, enhancing the surface altitude, etc. by cutting off a molecular combination on the surface of materials, and treating them properly on the activated surface, and since joining the Plaintiff company around September 16, 200, after entering the Plaintiff company as a technical research institute that researches and develops electronic circuits among the devices in this case, and thereafter operates the “F” (hereinafter referred to as “F”) after leaving the Plaintiff company around February 201.

B. On February 25, 2015, the Plaintiff completed the patent registration with the name of the invention(s) as “H” as to the instant device as a patented G. In order to manufacture the instant device, PCB program drawings, electronic circuit drawings, electrical drawings, technical data, and assembly drawings, and mechanical drawings are required. Of them, the mechanical drawings are self-developed by the Plaintiff.

From 2010 to 2015, the Plaintiff has manufactured and sold the instant devices using the instant mechanical drawings.

C. Meanwhile, the defendant is a person who manufactures metal machinery with the trade name of I.

From August 2010 to November 2012, the Defendant received a request from the Plaintiff for the manufacture of machinery parts, such as the passage of the instant devices from the Plaintiff, and refers to the 847 drawings of various mechanical parts drawings of the instant devices, such as the attached Form, 847, and the lower table.