beta
(영문) 서울중앙지방법원 2020.08.26 2019가단5042439

구상금

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Facts of recognition

On October 19, 2016, the Plaintiff entered into an insurance contract with the insurance company that runs the insurance business, with respect to the buildings, facilities, and office fixtures, etc. of Songpa-gu Seoul Metropolitan Government 1st Ground D D E (hereinafter “instant singing room”) with respect to the purchase amount of insurance coverage of KRW 283,00,000, and the insurance period from October 19, 201 to October 19, 2021, which set the insurance period as the insurance company’s amount of insurance coverage of KRW 283,00,000, and which compensates for losses caused by fire in the said subject matter (hereinafter “instant insurance contract”).

The Defendant is a manufacturer who manufactured and supplied the air-conditioner installed in the instant singing room (hereinafter “instant air-conditioner”) around 2009.

On April 19, 2018, at around 04:49, a fire occurred in the instant air conditioner, which was installed in the instant singing room, and the air conditioner destroyed the instant air conditioner and the instant singing room’s buildings, fixtures, etc.

(hereinafter referred to as “the instant fire.” As a result of the identification of the cause of the fire, only parts of pipes, tampers, coaches, electric wires, etc. remain on the inside side of the National Scientific Investigation Institute (Evidence No. 7 of the Evidence A), and it has been separately confirmed. As such, the air-conditioner operational machine board, etc. attached to the front panel is connected to the main unit of the power supply, which is connected with the 7/1.0m chain (the 200m chain/subline) chain at 7/1.0m (the 7/85m chain line) line at the front line at 7/00,0.85m chain line at the outside of the main unit of the fire, and the possibility of distinguishing the outer upper line from the main unit of the electric power supply, if any, more than 7/7/000m chain lines at two different locations, and the possibility of distinguishing the main unit from the main unit of the appraisal, and if any, more than 7/700m chain of the main unit of the appraisal.